Search
WEM at GBH
- oshcreu
- Sep 7, 2016
- 1 min read
Engr. Agno together with Ms. Janis Robles conducted Work Environment Measurement at GBH Power located in Pinamalayan, Oriental Mindoro on September 5 - 7, 2016.
GBH is engaged in producing electricity for Pinamalayan. Parameters measured are listed below:
1. llumination 2. Noise 3. General Ventilation (GV) 4. Local Exhaust Ventilation (LEV)
Recent Posts
See AllBEST conducted an in-house BOSH Training. A total of fourteen (14) attended the training composing of eleven (11) males and three (3)...