top of page

WEM at GBH

  • oshcreu
  • Sep 7, 2016
  • 1 min read

Engr. Agno together with Ms. Janis Robles conducted Work Environment Measurement at GBH Power located in Pinamalayan, Oriental Mindoro on September 5 - 7, 2016.

GBH is engaged in producing electricity for Pinamalayan. Parameters measured are listed below:

1. llumination 2. Noise 3. General Ventilation (GV) 4. Local Exhaust Ventilation (LEV)


Recent Posts

See All
Recent Posts
Post Categories
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page