top of page

WEM at National Power Corporation (NPC) – EMD Analytical Services

  • oshcreu
  • Oct 13, 2016
  • 1 min read

Engr. Agno together with Engr. Nelia Granadillos conducted Work Environment Measurement at NPC located at MRMD Bldg., Brgy. Buli, Muntinlupa City.


NPC is engaged in power distribution.. Parameters measured are listed below: 1.Solvents

2.Local Exhaust Ventilation (LEV)


Recent Posts

See All
Recent Posts
Post Categories
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page